Triple

T6832133
Position Surface form Disambiguated ID Type / Status
Subject South Boston Transitway E157161 entity
Predicate connects P390 FINISHED
Object South Station E18279 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Station | Statement: [South Boston Transitway, connects, South Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Station
Context triple: [South Boston Transitway, connects, South Station]
  • A. South Station chosen
    South Station is Boston’s major intercity rail and bus terminal and a key MBTA subway hub in the city’s downtown.
  • B. North Station
    North Station is a major transportation hub in Boston, Massachusetts, serving as a key commuter rail, subway, and intercity bus terminal integrated with the TD Garden arena.
  • C. MBTA North Station
    MBTA North Station is a major Boston transportation hub that serves as a key terminal for MBTA subway and commuter rail lines as well as Amtrak services.
  • D. Medford station
    Medford station is a Long Island Rail Road commuter rail stop located in Medford, New York, serving passengers on the Ronkonkoma Branch.
  • E. Lowell station
    Lowell station is a passenger rail station in Lowell, Massachusetts that serves as the northern terminus of the MBTA Commuter Rail’s Lowell Line.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882a5b5c8190917a7db9ed36bad1 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d62992908190996efab71cbf70f0 completed March 27, 2026, 7:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7426b3d2081909d0804a2fbc6efad completed March 28, 2026, 2:52 a.m.
Created at: March 27, 2026, 2:18 p.m.