Triple

T6830897
Position Surface form Disambiguated ID Type / Status
Subject Kegums Hydroelectric Power Plant E157132 entity
Predicate riverBasin P1559 FINISHED
Object Daugava basin E364609 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Daugava basin | Statement: [Kegums Hydroelectric Power Plant, riverBasin, Daugava basin]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Daugava basin
Context triple: [Kegums Hydroelectric Power Plant, riverBasin, Daugava basin]
  • A. Daugava River
    The Daugava River is a major Eastern European river flowing through Russia, Belarus, and Latvia before emptying into the Baltic Sea.
  • B. Western Dvina River chosen
    The Western Dvina River, also known as the Daugava, is a major Eastern European river flowing from Russia through Belarus and Latvia into the Baltic Sea.
  • C. Vistula basin
    The Vistula basin is the extensive drainage area of Poland’s longest river, the Vistula, encompassing numerous tributaries and their catchments across much of the country.
  • D. Neman River
    The Neman River is a major river in Eastern Europe that flows through Belarus and Lithuania before emptying into the Baltic Sea.
  • E. Northern Dvina River
    The Northern Dvina River is a major waterway in northwestern Russia that flows into the White Sea and has long served as an important route for trade and transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882a5b5c8190917a7db9ed36bad1 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d62820808190ad3c244893e88699 completed March 27, 2026, 7:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7881e300881909c1cad76bc8b23ff completed March 28, 2026, 7:49 a.m.
Created at: March 27, 2026, 2:18 p.m.