Triple

T6774652
Position Surface form Disambiguated ID Type / Status
Subject Ulsan-gwangyeoksi E155125 entity
Predicate hasMajorFacilityOf P105 FINISHED
Object SK Energy E153848 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SK Energy | Statement: [Ulsan-gwangyeoksi, hasMajorFacilityOf, SK Energy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SK Energy
Context triple: [Ulsan-gwangyeoksi, hasMajorFacilityOf, SK Energy]
  • A. SK Energy chosen
    SK Energy is a major South Korean petroleum and energy company and a core subsidiary of the SK Group conglomerate.
  • B. SK Group
    SK Group is one of South Korea’s largest conglomerates, with diversified businesses spanning energy, telecommunications, semiconductors, and chemicals.
  • C. Hanwha Group
    Hanwha Group is a major South Korean conglomerate with diversified businesses spanning chemicals, energy, defense, finance, and construction.
  • D. POSCO Holdings
    POSCO Holdings is a South Korean multinational steelmaking and materials conglomerate that serves as the holding company of the POSCO group, one of the world’s largest steel producers.
  • E. Hanwha Engineering & Construction
    Hanwha Engineering & Construction is a South Korean construction and engineering company known for undertaking large-scale international projects, including major stadiums and infrastructure developments.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68812ef7c819099369f51febb725c completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d7c94bac8190ae4b236d1b04bec9 completed March 27, 2026, 7:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c712ca48d88190b9f47b23264d4264 completed March 27, 2026, 11:29 p.m.
Created at: March 27, 2026, 2:13 p.m.