Triple

T675939
Position Surface form Disambiguated ID Type / Status
Subject General Electric E13076 entity
Predicate spunOff P1257 FINISHED
Object GE Vernova E83346 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GE Vernova | Statement: [General Electric, spunOff, GE Vernova]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GE Vernova
Context triple: [General Electric, spunOff, GE Vernova]
  • A. GE Vernova chosen
    GE Vernova is General Electric’s energy-focused business, encompassing power generation, grid, and renewable energy technologies and services.
  • B. Engie
    Engie is a major French multinational utility company specializing in electricity, natural gas, and energy services, with a strong focus on renewable and low-carbon energy solutions.
  • C. Tesla, Inc.
    Tesla, Inc. is an American electric vehicle and clean energy company known for pioneering mass-market electric cars, advanced battery technology, and autonomous driving innovations.
  • D. Tesla Powerpack
    Tesla Powerpack is a commercial and utility-scale lithium-ion battery energy storage system designed to store electricity, support grid stability, and enable large-scale renewable energy integration.
  • E. Tesla Megapack
    The Tesla Megapack is a large-scale, utility-grade lithium-ion battery system designed to store energy for the electrical grid and support renewable power integration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4933d3bf88190972041cd8cf143b9 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a4a04b2ae881908a5c23453bef8572 completed March 1, 2026, 8:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69a5dc9f5f7c8190a766c6b545d1abd8 completed March 2, 2026, 6:53 p.m.
Created at: March 1, 2026, 7:36 p.m.