Triple

T6747902
Position Surface form Disambiguated ID Type / Status
Subject Outer Loop E154264 entity
Predicate partOf P40 FINISHED
Object Capital Beltway E118555 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Capital Beltway | Statement: [Outer Loop, partOf, Capital Beltway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Capital Beltway
Context triple: [Outer Loop, partOf, Capital Beltway]
  • A. Capital Beltway chosen
    The Capital Beltway is a major circumferential highway encircling Washington, D.C., serving as a key transportation artery for the metropolitan region.
  • B. Baltimore Beltway
    The Baltimore Beltway is a major circumferential highway encircling Baltimore, Maryland, connecting the city's suburbs and key regional routes.
  • C. Dulles Greenway
    Dulles Greenway is a privately owned toll road in Northern Virginia that connects Washington Dulles International Airport with communities in Loudoun County.
  • D. Dulles Access Road
    The Dulles Access Road is a limited-access highway in Northern Virginia that provides direct, toll-free access between the Capital Beltway and Washington Dulles International Airport.
  • E. Dulles Corridor
    Dulles Corridor is a major high-technology and business hub in Northern Virginia that stretches along the Dulles Toll Road and connects the Washington, D.C. suburbs to Washington Dulles International Airport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880ef37881909268a5a7299b9293 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d1d785dc81909c033084d2068568 completed March 27, 2026, 6:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69c77521651c8190aa10d3a7302e2a63 completed March 28, 2026, 6:28 a.m.
Created at: March 27, 2026, 2:11 p.m.