Triple
T6726419
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Santiago Metro Line 3 |
E153528
|
entity |
| Predicate | hasConnectionWith |
P845
|
FINISHED |
| Object | Santiago Metro Line 7 (under construction) |
E59645
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Santiago Metro Line 7 (under construction) | Statement: [Santiago Metro Line 3, hasConnectionWith, Santiago Metro Line 7 (under construction)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Santiago Metro Line 7 (under construction) Context triple: [Santiago Metro Line 3, hasConnectionWith, Santiago Metro Line 7 (under construction)]
-
A.
MRT Line 7 (under construction)
MRT Line 7 (under construction) is a forthcoming rapid transit line in Metro Manila designed to connect Quezon City with the eastern part of Bulacan to help ease traffic congestion and improve commuter mobility.
-
B.
Mexico City Metro Line 7
Mexico City Metro Line 7 is a major rapid transit line running through the western and southwestern parts of Mexico City, connecting key residential, commercial, and governmental areas.
-
C.
Line 7 (planned)
chosen
Line 7 (planned) is a future addition to the Santiago Metro network intended to expand rapid transit service to new areas of Chile’s capital.
-
D.
Santiago Metro Line 5
Santiago Metro Line 5 is a major rapid transit line in the Santiago Metro network that runs east–west across the Chilean capital, connecting key commercial, residential, and historic areas.
-
E.
Ho Chi Minh City Metro (under construction)
The Ho Chi Minh City Metro is a developing rapid transit system intended to provide modern urban rail service and alleviate traffic congestion in Vietnam’s largest city.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6880afb988190ad88011b48ecfcba |
completed | March 27, 2026, 1:37 p.m. |
| NER | Named-entity recognition | batch_69c6d15131f08190aba6c00943c51331 |
completed | March 27, 2026, 6:49 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c700a5428c81908d4484c3e3734076 |
completed | March 27, 2026, 10:11 p.m. |
Created at: March 27, 2026, 2:08 p.m.