Triple

T6726419
Position Surface form Disambiguated ID Type / Status
Subject Santiago Metro Line 3 E153528 entity
Predicate hasConnectionWith P845 FINISHED
Object Santiago Metro Line 7 (under construction) E59645 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Santiago Metro Line 7 (under construction) | Statement: [Santiago Metro Line 3, hasConnectionWith, Santiago Metro Line 7 (under construction)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Santiago Metro Line 7 (under construction)
Context triple: [Santiago Metro Line 3, hasConnectionWith, Santiago Metro Line 7 (under construction)]
  • A. MRT Line 7 (under construction)
    MRT Line 7 (under construction) is a forthcoming rapid transit line in Metro Manila designed to connect Quezon City with the eastern part of Bulacan to help ease traffic congestion and improve commuter mobility.
  • B. Mexico City Metro Line 7
    Mexico City Metro Line 7 is a major rapid transit line running through the western and southwestern parts of Mexico City, connecting key residential, commercial, and governmental areas.
  • C. Line 7 (planned) chosen
    Line 7 (planned) is a future addition to the Santiago Metro network intended to expand rapid transit service to new areas of Chile’s capital.
  • D. Santiago Metro Line 5
    Santiago Metro Line 5 is a major rapid transit line in the Santiago Metro network that runs east–west across the Chilean capital, connecting key commercial, residential, and historic areas.
  • E. Ho Chi Minh City Metro (under construction)
    The Ho Chi Minh City Metro is a developing rapid transit system intended to provide modern urban rail service and alleviate traffic congestion in Vietnam’s largest city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880afb988190ad88011b48ecfcba completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d15131f08190aba6c00943c51331 completed March 27, 2026, 6:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69c700a5428c81908d4484c3e3734076 completed March 27, 2026, 10:11 p.m.
Created at: March 27, 2026, 2:08 p.m.