Triple
T6701713
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kishiwada Port |
E152894
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal facility |
C16012
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal facility Context triple: [Kishiwada Port, instanceOf, coastal facility]
-
A.
coastal harbour
chosen
A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
-
B.
coastal campus
A coastal campus is an educational institution whose grounds are located adjacent to or near a coastline, integrating academic facilities with marine-influenced natural surroundings and resources.
-
C.
coastal industrial area
A coastal industrial area is a shoreline zone dominated by factories, ports, warehouses, and related infrastructure that support manufacturing, shipping, and other large-scale economic activities.
-
D.
coastal region
A coastal region is a geographic area where land meets the ocean or sea, characterized by unique environmental, economic, and cultural features shaped by its proximity to the shoreline.
-
E.
coastal reservation
A coastal reservation is a protected shoreline area designated to conserve marine and coastal ecosystems while allowing limited, sustainable human use and cultural activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68807adbc8190b8632df42b39eda0 |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 2:06 p.m.