Triple

T664762
Position Surface form Disambiguated ID Type / Status
Subject M62 motorway E12835 entity
Predicate hasJunctionWith P1018 FINISHED
Object M1 motorway E86446 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M1 motorway | Statement: [M62 motorway, hasJunctionWith, M1 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M1 motorway
Context triple: [M62 motorway, hasJunctionWith, M1 motorway]
  • A. M1 motorway chosen
    The M1 motorway is a major north–south highway in England linking London with key cities in the Midlands and northern England.
  • B. M2 motorway
    The M2 motorway is a major road in southeast England that connects the outskirts of London with the north coast of Kent, providing a key route towards the Channel ports.
  • C. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • D. M3 motorway
    The M3 motorway is a major road in southern England that connects London to Southampton, passing through counties including Surrey and Hampshire.
  • E. M5 motorway
    The M5 motorway is a major north–south route in England that runs from the West Midlands near Birmingham down through the West Country to Exeter, serving as a key link between the Midlands and southwest England.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493355dec819098d4244b2fa34885 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a49fd3d8fc8190866af5c76c08f486 completed March 1, 2026, 8:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69acce4b94d08190b7747b0b6d61e3e1 completed March 8, 2026, 1:18 a.m.
Created at: March 1, 2026, 7:36 p.m.