Triple
T6643541
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wembley Arch |
E150643
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steel arch |
C462
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steel arch Context triple: [Wembley Arch, instanceOf, steel arch]
-
A.
steel arch bridge
chosen
A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
-
B.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
C.
truss bridge
A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
-
D.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
E.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f1a3048190828b7342f7125d5c |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 2 p.m.