Triple

T6641208
Position Surface form Disambiguated ID Type / Status
Subject Mughrabi Bridge E150589 entity
Predicate instanceOf P0 FINISHED
Object wooden structure C3859 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wooden structure
Context triple: [Mughrabi Bridge, instanceOf, wooden structure]
  • A. timber structure
    A timber structure is a construction system in which the primary load-bearing framework is made from engineered or solid wood members connected to safely transfer loads to the foundation.
  • B. A-frame structure
    An A-frame structure is a simple, triangular building or framework formed by two sloping sides that meet at the top in the shape of the letter "A," providing strong, stable support with minimal materials.
  • C. wooden pole
    A wooden pole is a long, cylindrical piece of wood used primarily for support, boundary marking, or structural purposes in construction and outdoor settings.
  • D. wooden palace
    A wooden palace is a grand, ornately designed residence or ceremonial building constructed primarily from timber, showcasing intricate craftsmanship and often reflecting the cultural and historical aesthetics of its region.
  • E. wooden footbridge chosen
    A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f1a3048190828b7342f7125d5c completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 2 p.m.