Triple
T6636307
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | División de Mantenimiento |
E150459
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | unidad logística |
C8231
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: unidad logística Context triple: [División de Mantenimiento, instanceOf, unidad logística]
-
A.
logistical operation
A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
-
B.
logistics command
Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
-
C.
operational unit
chosen
An operational unit is an organized group, department, or component within a larger system that performs specific tasks or functions to achieve defined operational objectives.
-
D.
Marine Air-Ground Task Force logistics element
The Marine Air-Ground Task Force logistics element is the component responsible for providing comprehensive combat service support—including supply, maintenance, transportation, health services, and engineering—to sustain the MAGTF’s operations across all domains.
-
E.
cargo militar
Cargo militar es una posición o función oficial dentro de una organización de defensa o fuerzas armadas, caracterizada por responsabilidades jerárquicas, operativas y administrativas específicas en el ámbito militar.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f0ceb08190bf40807bfc605fa5 |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 1:59 p.m.