Triple

T663365
Position Surface form Disambiguated ID Type / Status
Subject Hollywood Reservoir E12805 entity
Predicate instanceOf P0 FINISHED
Object water supply reservoir C377 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water supply reservoir
Context triple: [Hollywood Reservoir, instanceOf, water supply reservoir]
  • A. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • B. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • C. man-made lake chosen
    A man-made lake is an artificial body of standing water created by human intervention, typically through damming rivers or excavating land, for purposes such as water supply, recreation, irrigation, or hydroelectric power.
  • D. watershed
    A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
  • E. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493355dec819098d4244b2fa34885 completed March 1, 2026, 7:27 p.m.
Created at: March 1, 2026, 7:36 p.m.