Triple

T6623574
Position Surface form Disambiguated ID Type / Status
Subject Neuquén River E149737 entity
Predicate hasDam P8736 FINISHED
Object El Chañar Dam
El Chañar Dam is a hydroelectric and irrigation dam located on the Neuquén River in Argentina’s Neuquén Province.
E608522 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: El Chañar Dam | Statement: [Neuquén River, hasDam, El Chañar Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: El Chañar Dam
Context triple: [Neuquén River, hasDam, El Chañar Dam]
  • A. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • B. El Quimbo Dam
    El Quimbo Dam is a large hydroelectric dam on the Magdalena River in Colombia, built to generate power and support the country’s energy supply.
  • C. Piedra del Águila Dam
    Piedra del Águila Dam is a major hydroelectric dam in Argentine Patagonia, known for its large power-generating capacity and role in regulating the Limay River.
  • D. San Roque Dam
    San Roque Dam is one of the largest dams in the Philippines, serving as a major source of hydroelectric power, irrigation, and flood control in the Luzon region.
  • E. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: El Chañar Dam
Triple: [Neuquén River, hasDam, El Chañar Dam]
Generated description
El Chañar Dam is a hydroelectric and irrigation dam located on the Neuquén River in Argentina’s Neuquén Province.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: El Chañar Dam
Target entity description: El Chañar Dam is a hydroelectric and irrigation dam located on the Neuquén River in Argentina’s Neuquén Province.
  • A. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • B. El Quimbo Dam
    El Quimbo Dam is a large hydroelectric dam on the Magdalena River in Colombia, built to generate power and support the country’s energy supply.
  • C. Piedra del Águila Dam
    Piedra del Águila Dam is a major hydroelectric dam in Argentine Patagonia, known for its large power-generating capacity and role in regulating the Limay River.
  • D. San Roque Dam
    San Roque Dam is one of the largest dams in the Philippines, serving as a major source of hydroelectric power, irrigation, and flood control in the Luzon region.
  • E. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687ed8a9c81908bb671717cb192ef completed March 27, 2026, 1:36 p.m.
NER Named-entity recognition batch_69c6af7decb08190a7b1ddb95e534a6a completed March 27, 2026, 4:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6eee8740881908b4fafb12db6b7f3 completed March 27, 2026, 8:56 p.m.
NEDg Description generation batch_69c6f09ffdd481909418ae33d1683486 completed March 27, 2026, 9:03 p.m.
NED2 Entity disambiguation (via description) batch_69c6f159cbf08190a22d7488584b4580 completed March 27, 2026, 9:06 p.m.
Created at: March 27, 2026, 1:58 p.m.