Triple
T660146
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scud missile |
E11734
|
entity |
| Predicate | hasVariant |
P455
|
FINISHED |
| Object | Scud-C |
E11734
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scud-C | Statement: [Scud missile, hasVariant, Scud-C]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Scud-C Context triple: [Scud missile, hasVariant, Scud-C]
-
A.
Scud missiles
chosen
Scud missiles are Soviet-designed short-range ballistic missiles that gained widespread notoriety for their use by Iraq to attack coalition and civilian targets during the Gulf War.
-
B.
SCAP
SCAP was the title held by General Douglas MacArthur as the top Allied authority overseeing the occupation and reconstruction of Japan after World War II.
-
C.
Redoutable
Redoutable was a French ship of the line that gained historical significance for its role in major 18th-century naval engagements, including the Battle of Lagos.
-
D.
Brimstone missile
The Brimstone missile is a British air-launched, precision-guided anti-armor and multi-role strike weapon designed for high accuracy against moving and static targets with minimal collateral damage.
-
E.
B Reactor
B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4932862a0819098be659c814e4981 |
completed | March 1, 2026, 7:27 p.m. |
| NER | Named-entity recognition | batch_69a49fa83c6081909fb786d1773fa88c |
completed | March 1, 2026, 8:20 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a64a4d77e0819098cdd416136fd374 |
completed | March 3, 2026, 2:41 a.m. |
Created at: March 1, 2026, 7:36 p.m.