Triple

T660146
Position Surface form Disambiguated ID Type / Status
Subject Scud missile E11734 entity
Predicate hasVariant P455 FINISHED
Object Scud-C E11734 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scud-C | Statement: [Scud missile, hasVariant, Scud-C]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Scud-C
Context triple: [Scud missile, hasVariant, Scud-C]
  • A. Scud missiles chosen
    Scud missiles are Soviet-designed short-range ballistic missiles that gained widespread notoriety for their use by Iraq to attack coalition and civilian targets during the Gulf War.
  • B. SCAP
    SCAP was the title held by General Douglas MacArthur as the top Allied authority overseeing the occupation and reconstruction of Japan after World War II.
  • C. Redoutable
    Redoutable was a French ship of the line that gained historical significance for its role in major 18th-century naval engagements, including the Battle of Lagos.
  • D. Brimstone missile
    The Brimstone missile is a British air-launched, precision-guided anti-armor and multi-role strike weapon designed for high accuracy against moving and static targets with minimal collateral damage.
  • E. B Reactor
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4932862a0819098be659c814e4981 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a49fa83c6081909fb786d1773fa88c completed March 1, 2026, 8:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69a64a4d77e0819098cdd416136fd374 completed March 3, 2026, 2:41 a.m.
Created at: March 1, 2026, 7:36 p.m.