Triple

T659705
Position Surface form Disambiguated ID Type / Status
Subject Tractatus Politicus E11725 entity
Predicate unfinished P18162 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Tractatus Politicus, unfinished, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: unfinished
Context triple: [Tractatus Politicus, unfinished, true]
  • A. draft
    Indicates that one entity prepares an initial or preliminary version of something, typically a document, plan, or design, which may be revised later.
  • B. closed
    Indicates that an entity has brought something (such as an object, container, or space) from an open state into a shut or sealed state, or that it is currently in that shut state.
  • C. opened
    Indicates that one entity caused another entity (such as an object, container, or passage) to change from a closed or inaccessible state to an open or accessible state.
  • D. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. undergoing
    Indicates that an entity is currently experiencing, being subjected to, or in the process of a particular action, change, or treatment.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4932862a0819098be659c814e4981 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a4a0f55f7481909e052a25bd12d455 completed March 1, 2026, 8:26 p.m.
PD Predicate disambiguation batch_69a49d1406ec8190abf546549264c85d completed March 1, 2026, 8:09 p.m.
PDg Predicate description generation batch_69a4a0f405748190ba72a9cfe946a8ec completed March 1, 2026, 8:26 p.m.
Created at: March 1, 2026, 7:36 p.m.