Triple
T6596298
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kishanganga Hydroelectric Plant |
E148483
|
entity |
| Predicate | designedForRunOfRiverOperation |
P50031
|
FINISHED |
| Object | yes |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [Kishanganga Hydroelectric Plant, designedForRunOfRiverOperation, yes]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: designedForRunOfRiverOperation Context triple: [Kishanganga Hydroelectric Plant, designedForRunOfRiverOperation, yes]
-
A.
operatesOnRiver
Indicates that an entity conducts its operations or activities on, along, or directly involving a river.
-
B.
hasHydrologicalFunction
Indicates that something performs a role or action related to the movement, storage, or regulation of water within a hydrological system.
-
C.
operatedCanal
Indicates that one entity managed and ran the functioning of a canal for another entity or in a given context.
-
D.
designedFloodDischarge
Indicates the planned or specified amount of water flow that a structure or system is engineered to safely discharge during flood conditions.
-
E.
runOfTheRiver
chosen
Indicates a relationship where a hydroelectric facility operates using the natural flow and elevation drop of a river without significant water storage or regulation by a large reservoir.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687e7b8688190811ffee72e096468 |
completed | March 27, 2026, 1:36 p.m. |
| NER | Named-entity recognition | batch_69c6cc9c6cb0819084fec8e0beb430de |
completed | March 27, 2026, 6:29 p.m. |
| PD | Predicate disambiguation | batch_69c6acfd17388190bd0bb8b2371e7df1 |
completed | March 27, 2026, 4:14 p.m. |
Created at: March 27, 2026, 1:56 p.m.