Triple
T6593692
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beirut Hippodrome |
E148423
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | green urban space |
C218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: green urban space Context triple: [Beirut Hippodrome, instanceOf, green urban space]
-
A.
greenbelt
A greenbelt is a designated area of open, undeveloped, and often protected land surrounding or within urban regions, intended to limit urban sprawl, preserve natural habitats, and provide recreational space.
-
B.
urban park
chosen
An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
-
C.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
D.
greenway
A greenway is a linear, often vegetated corridor of land or water designed primarily for recreation, conservation, and non-motorized transportation.
-
E.
rooftop garden
A rooftop garden is a cultivated green space installed on the roof of a building, typically used for growing plants, improving insulation, and enhancing urban environmental quality.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687e7b8688190811ffee72e096468 |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 1:55 p.m.