Triple

T6561920
Position Surface form Disambiguated ID Type / Status
Subject Kongo Central Province E153802 entity
Predicate hasPort P35 FINISHED
Object Port of Muanda E28876 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Port of Muanda | Statement: [Kongo Central Province, hasPort, Port of Muanda]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Port of Muanda
Context triple: [Kongo Central Province, hasPort, Port of Muanda]
  • A. Port of Muanda chosen
    The Port of Muanda is a coastal seaport in the Democratic Republic of the Congo that serves as a key maritime outlet near the Atlantic terminus of the Congo River.
  • B. Port of Malabo
    The Port of Malabo is the principal seaport of Equatorial Guinea’s capital city, serving as a key hub for the country’s oil, gas, and general maritime trade in the Gulf of Guinea.
  • C. Port of Boma
    The Port of Boma is a key maritime gateway on the Congo River in the Democratic Republic of the Congo, serving regional trade and transport in Kongo Central Province.
  • D. Port of Matadi
    The Port of Matadi is a major seaport on the Congo River in the Democratic Republic of the Congo, serving as a key gateway for the country’s international maritime trade.
  • E. Port of Douala
    The Port of Douala is Cameroon’s principal seaport and a major Central African maritime hub for regional trade and cargo transit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880cb35881909b763eb0125236b9 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6ae38e94081908f964d130f9147d8 completed March 27, 2026, 4:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6eed99a1c8190b37da0ffed24e203 completed March 27, 2026, 8:55 p.m.
Created at: March 27, 2026, 1:52 p.m.