Triple
T6539712
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Intercolonial Railway of Canada |
E168253
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | government-owned railway |
C5158
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: government-owned railway Context triple: [Intercolonial Railway of Canada, instanceOf, government-owned railway]
-
A.
state-owned railroad
chosen
A state-owned railroad is a railway system owned and operated by a government entity, providing rail transport services as a public enterprise.
-
B.
national railway company
A national railway company is a state-owned or state-controlled organization responsible for operating and managing a country's primary passenger and freight rail transport services and infrastructure.
-
C.
national railway system
A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
-
D.
rail transport company
A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a51564081909e93aee0dbd9cca3 |
completed | March 27, 2026, 1:46 p.m. |
Created at: March 27, 2026, 1:50 p.m.