Triple

T65110
Position Surface form Disambiguated ID Type / Status
Subject American Airlines Center E1295 entity
Predicate instanceOf P0 FINISHED
Object multi-purpose arena C344 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multi-purpose arena
Context triple: [American Airlines Center, instanceOf, multi-purpose arena]
  • A. multi-purpose stadium
    A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
  • B. sports and recreation facility
    A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
  • C. sports venue chosen
    A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
  • D. indoor athletic facility
    An indoor athletic facility is a covered, climate-controlled space equipped with specialized areas and equipment designed to support a variety of sports, fitness activities, and physical training programs year-round.
  • E. multi-sport event
    A multi-sport event is a large-scale organized competition in which athletes from various regions or groups compete across multiple different sports within a unified program and schedule.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24ba4f760819081f6638a3c70538a completed Feb. 28, 2026, 1:57 a.m.
Created at: Feb. 28, 2026, 2:02 a.m.