Triple

T6510729
Position Surface form Disambiguated ID Type / Status
Subject Holston River E150123 entity
Predicate hasDam P8736 FINISHED
Object South Holston Dam E265533 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Holston Dam | Statement: [Holston River, hasDam, South Holston Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Holston Dam
Context triple: [Holston River, hasDam, South Holston Dam]
  • A. South Holston Dam chosen
    South Holston Dam is a large Tennessee Valley Authority hydroelectric and flood-control dam on the South Fork Holston River in northeastern Tennessee.
  • B. Apalachia Dam
    Apalachia Dam is a hydroelectric dam in western North Carolina that impounds the Hiwassee River to generate power and help manage regional water resources.
  • C. Nolin River Dam
    Nolin River Dam is a flood-control and recreation dam located on the Nolin River in central Kentucky, forming Nolin River Lake.
  • D. Summersville Dam
    Summersville Dam is a large rock-fill dam on the Gauley River in West Virginia, known for creating Summersville Lake and supporting popular whitewater recreation downstream.
  • E. Hartwell Dam
    Hartwell Dam is a large hydroelectric and flood-control dam on the Savannah River that creates Lake Hartwell along the Georgia–South Carolina border.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687ef291081909d437f035eef1cda completed March 27, 2026, 1:36 p.m.
NER Named-entity recognition batch_69c69f3ad7d081909162f1a625fc52b1 completed March 27, 2026, 3:16 p.m.
NED1 Entity disambiguation (via context triple) batch_69c70adfd6e48190badc31135f9b69a3 completed March 27, 2026, 10:55 p.m.
Created at: March 27, 2026, 1:43 p.m.