Triple

T65015
Position Surface form Disambiguated ID Type / Status
Subject Dallas County, Texas E1292 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 30 E17051 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 30 | Statement: [Dallas County, Texas, hasMajorHighway, Interstate 30]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 30
Context triple: [Dallas County, Texas, hasMajorHighway, Interstate 30]
  • A. Interstate 30 chosen
    Interstate 30 is a major east–west U.S. highway running through Texas and Arkansas, connecting cities such as Dallas and Fort Worth to Little Rock.
  • B. Interstate 35
    Interstate 35 is a major north–south U.S. highway running from the Mexican border in Texas through the central United States to Minnesota, serving numerous key cities along its route.
  • C. Interstate 35E
    Interstate 35E is the eastern branch of Interstate 35 that runs through Dallas, Texas, serving as a key north–south transportation corridor in the region.
  • D. Interstate 20
    Interstate 20 is a major east–west U.S. highway running from Texas to South Carolina, serving as a key transportation corridor across the southern United States.
  • E. U.S. Route 75
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24ba4f760819081f6638a3c70538a completed Feb. 28, 2026, 1:57 a.m.
NER Named-entity recognition batch_69a24ee6ba348190b00977285d74d8f5 completed Feb. 28, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69a3bc1de7408190833fe3fb65c2a7b3 completed March 1, 2026, 4:10 a.m.
Created at: Feb. 28, 2026, 2:02 a.m.