Triple

T65013
Position Surface form Disambiguated ID Type / Status
Subject Dallas County, Texas E1292 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 35E E16581 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 35E | Statement: [Dallas County, Texas, hasMajorHighway, Interstate 35E]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 35E
Context triple: [Dallas County, Texas, hasMajorHighway, Interstate 35E]
  • A. Interstate 35E chosen
    Interstate 35E is the eastern branch of Interstate 35 that runs through Dallas, Texas, serving as a key north–south transportation corridor in the region.
  • B. Interstate 35
    Interstate 35 is a major north–south U.S. highway running from the Mexican border in Texas through the central United States to Minnesota, serving numerous key cities along its route.
  • C. Interstate 29
    Interstate 29 is a major north–south U.S. highway running through the Great Plains from Missouri to North Dakota, connecting cities such as Kansas City, Sioux City, and Fargo.
  • D. Interstate 30
    Interstate 30 is a major east–west U.S. highway running through Texas and Arkansas, connecting cities such as Dallas and Fort Worth to Little Rock.
  • E. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24ba4f760819081f6638a3c70538a completed Feb. 28, 2026, 1:57 a.m.
NER Named-entity recognition batch_69a24ee6ba348190b00977285d74d8f5 completed Feb. 28, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69a3b06cd4b4819086bcc9c1c06e84ff completed March 1, 2026, 3:20 a.m.
Created at: Feb. 28, 2026, 2:02 a.m.