Triple

T6489537
Position Surface form Disambiguated ID Type / Status
Subject San Antonio River E147999 entity
Predicate hasRehabilitationProject P14971 FINISHED
Object San Antonio River Improvements Project E399838 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Antonio River Improvements Project | Statement: [San Antonio River, hasRehabilitationProject, San Antonio River Improvements Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: San Antonio River Improvements Project
Context triple: [San Antonio River, hasRehabilitationProject, San Antonio River Improvements Project]
  • A. San Antonio river improvement project chosen
    The San Antonio River Improvement Project is a large-scale urban revitalization and flood-control initiative that expanded and enhanced the San Antonio River and its surroundings, including the famous River Walk, to support recreation, ecology, and tourism.
  • B. Trinity River Restoration Program
    The Trinity River Restoration Program is a collaborative federal, state, tribal, and local initiative focused on restoring fish and wildlife habitats and natural river processes in California’s Trinity River Basin while balancing water and resource uses.
  • C. Carroll Creek flood control project
    Carroll Creek flood control project is an urban water management and revitalization initiative in Frederick, Maryland, designed to prevent flooding while supporting public spaces, trails, and downtown redevelopment along Carroll Creek.
  • D. Fannin-McFarland Aqueduct
    Fannin-McFarland Aqueduct is a major water conveyance canal in Arizona that forms part of the Central Arizona Project system delivering Colorado River water to central and southern Arizona.
  • E. San Antonio River Authority
    The San Antonio River Authority is a regional government agency responsible for managing, protecting, and enhancing the San Antonio River and its surrounding watershed in South Texas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasRehabilitationProject
Context triple: [San Antonio River, hasRehabilitationProject, San Antonio River Improvements Project]
  • A. hasProject chosen
    Indicates that an entity is associated with or responsible for a particular project.
  • B. rehabilitationEvent
    Indicates an event in which an entity undergoes a process of rehabilitation, such as recovery, restoration, or reintegration following damage, illness, or misconduct.
  • C. rehabilitatedBy
    Indicates that an entity has been restored, treated, or brought back to a better or functional state through the actions or intervention of another entity.
  • D. hasProjectIn
    Indicates that an entity is involved with or associated with a project that takes place within a specified location or context.
  • E. hasHealthProgram
    Indicates that an entity provides, administers, or is associated with a specific health-related program or initiative.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c009088f3081909cd467b05919de30 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c06a9926fc81909db0f390e385e97d completed March 22, 2026, 10:18 p.m.
NED1 Entity disambiguation (via context triple) batch_69c65fdc835081909772f3a3aaee538f completed March 27, 2026, 10:45 a.m.
PD Predicate disambiguation batch_69c06740bebc81909d9d6956baa2bcb9 completed March 22, 2026, 10:03 p.m.
Created at: March 22, 2026, 4:52 p.m.