Triple

T6485402
Position Surface form Disambiguated ID Type / Status
Subject River Tummel E146495 entity
Predicate hasHydroelectricStation P15311 FINISHED
Object Pitlochry Dam power station E446732 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pitlochry Dam power station | Statement: [River Tummel, hasHydroelectricStation, Pitlochry Dam power station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pitlochry Dam power station
Context triple: [River Tummel, hasHydroelectricStation, Pitlochry Dam power station]
  • A. Pitlochry Dam chosen
    Pitlochry Dam is a mid-20th-century hydroelectric dam on the River Tummel in Scotland, noted for its power station and popular salmon ladder attraction.
  • B. Aviemore Power Station
    Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
  • C. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • D. Kettle Generating Station
    Kettle Generating Station is a major hydroelectric power plant on Manitoba’s Nelson River that forms part of the large-scale northern generating system supplying electricity to the province.
  • E. Derwent hydropower scheme
    The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0090158c08190af0df9a2348d2d52 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c06a6efe1881909a044b1cdaa511af completed March 22, 2026, 10:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c65fd88d7c8190a98b7a48d49280c3 completed March 27, 2026, 10:45 a.m.
Created at: March 22, 2026, 4:52 p.m.