Triple

T6457644
Position Surface form Disambiguated ID Type / Status
Subject Príncipe Pío station E142033 entity
Predicate instanceOf P0 FINISHED
Object intermodal transport hub C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intermodal transport hub
Context triple: [Príncipe Pío station, instanceOf, intermodal transport hub]
  • A. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • B. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • C. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • D. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • E. rapid transit depot
    A rapid transit depot is a specialized facility where urban rail vehicles are stored, inspected, maintained, and dispatched for service on a rapid transit network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d2f91c8190a8178767a35e08fc completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:48 p.m.