Triple

T6451754
Position Surface form Disambiguated ID Type / Status
Subject Fifth Avenue–Bryant Park E139883 entity
Predicate stationComplexConnection P19050 FINISHED
Object 42nd Street–Bryant Park station complex E170020 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 42nd Street–Bryant Park station complex | Statement: [Fifth Avenue–Bryant Park, stationComplexConnection, 42nd Street–Bryant Park station complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 42nd Street–Bryant Park station complex
Context triple: [Fifth Avenue–Bryant Park, stationComplexConnection, 42nd Street–Bryant Park station complex]
  • A. 34th Street–Herald Square station
    34th Street–Herald Square station is a major New York City subway hub in Midtown Manhattan that serves multiple lines and provides access to nearby shopping, business, and cultural districts.
  • B. Fifth Avenue–Bryant Park subway station
    The Fifth Avenue–Bryant Park subway station is a New York City Subway complex in Midtown Manhattan serving the 7, B, D, F, and M lines near Bryant Park and the New York Public Library.
  • C. Grand Central–42nd Street station
    Grand Central–42nd Street station is a major New York City transit hub in Midtown Manhattan that connects multiple subway lines with Grand Central Terminal’s commuter rail services.
  • D. 42 St–Bryant Park subway station chosen
    The 42 St–Bryant Park subway station is a major New York City Subway complex in Midtown Manhattan serving multiple lines and providing access to Bryant Park and nearby Times Square.
  • E. 59th Street–Columbus Circle station
    59th Street–Columbus Circle station is a major New York City Subway hub in Manhattan, serving multiple lines at the southwest corner of Central Park.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: stationComplexConnection
Context triple: [Fifth Avenue–Bryant Park, stationComplexConnection, 42nd Street–Bryant Park station complex]
  • A. stationComplex chosen
    Indicates a relationship where one entity is a station complex that encompasses or is associated with another station-related entity.
  • B. associatedStation
    Indicates a relationship where one entity is linked or connected to a particular station as its relevant or related station.
  • C. servesAsThroughStationFor
    Indicates that a station functions as an intermediate (through) stop for a particular service, route, or journey rather than as its starting or ending point.
  • D. interchangeStation
    Indicates a station where passengers can transfer between different routes, lines, or modes of transportation.
  • E. stationType
    Indicates the specific category or classification of a station based on its function, services, or operational characteristics.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b301948190a35854e5284dc822 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c069b62cbc81908b7f1a0dc1ed3e1d completed March 22, 2026, 10:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69c65394d8b481909868faf79f3d2383 completed March 27, 2026, 9:53 a.m.
PD Predicate disambiguation batch_69c0673b44148190aed70084f0ff4992 completed March 22, 2026, 10:03 p.m.
Created at: March 22, 2026, 4:47 p.m.