Triple

T6448639
Position Surface form Disambiguated ID Type / Status
Subject New Haven Line E139806 entity
Predicate hasStation P35 FINISHED
Object Stamford station E169987 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Stamford station | Statement: [New Haven Line, hasStation, Stamford station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Stamford station
Context triple: [New Haven Line, hasStation, Stamford station]
  • A. Stamford station chosen
    Stamford station is a major commuter rail hub in Stamford, Connecticut, serving as one of the busiest stops on the Metro-North Railroad and a key gateway between New York City and New England.
  • B. Meriden station
    Meriden station is a passenger rail station in Meriden, Connecticut, serving CTrail Hartford Line and Amtrak trains along the New Haven–Springfield corridor.
  • C. Waterbury station
    Waterbury station is a Metro-North Railroad commuter rail station in Waterbury, Connecticut, serving as the primary rail hub for the city.
  • D. Medford station
    Medford station is a Long Island Rail Road commuter rail stop located in Medford, New York, serving passengers on the Ronkonkoma Branch.
  • E. Bridgeport station
    Bridgeport station is a major Metro-North Railroad and Amtrak rail hub in Bridgeport, Connecticut, providing regional and commuter rail connections along the Northeast Corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b301948190a35854e5284dc822 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c069b1a61c81908610264c098d25b0 completed March 22, 2026, 10:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69c65fcb6974819094759e4b7903049b completed March 27, 2026, 10:45 a.m.
Created at: March 22, 2026, 4:47 p.m.