Triple

T6443496
Position Surface form Disambiguated ID Type / Status
Subject wasi-http E138282 entity
Predicate instanceOf P0 FINISHED
Object WASI proposal C14876 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: WASI proposal
Context triple: [wasi-http, instanceOf, WASI proposal]
  • A. WebAssembly-related standard
    A WebAssembly-related standard is a formal specification that defines interoperable behaviors, formats, or APIs extending or integrating with the core WebAssembly platform to ensure consistent execution across diverse environments.
  • B. WebAssembly API method
    A WebAssembly API method is a function exposed by the WebAssembly runtime or host environment that enables loading, instantiating, interacting with, and managing WebAssembly modules from external code.
  • C. HTML specification proposal
    A HTML specification proposal is a formal document outlining suggested changes, additions, or clarifications to the HTML standard, including rationale, technical details, and potential impacts on existing implementations.
  • D. WHATWG specification
    A WHATWG specification is a living technical standard developed by the Web Hypertext Application Technology Working Group that defines and evolves core web platform technologies such as HTML, DOM, and related APIs.
  • E. work-in-progress specification chosen
    A work-in-progress specification is a partially developed, evolving document that defines requirements, designs, or standards that are still under active review and subject to change.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008aa61ac8190bc96715ed79fe2d8 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:46 p.m.