Triple
T6416348
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coppet railway station |
E127838
|
entity |
| Predicate | servedBy |
P82
|
FINISHED |
| Object | RER Vaud |
E501798
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RER Vaud | Statement: [Coppet railway station, servedBy, RER Vaud]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: RER Vaud Context triple: [Coppet railway station, servedBy, RER Vaud]
-
A.
RER Vaud
chosen
RER Vaud is a regional express rail network in the canton of Vaud, Switzerland, providing frequent commuter and regional train services connecting local towns and cities.
-
B.
RER A
RER A is one of the main lines of the Paris regional express network, carrying large volumes of commuters and travelers between central Paris and its suburbs.
-
C.
RER B line
The RER B line is a major Paris regional express railway line that connects central Paris with key northern and southern suburbs, including Charles de Gaulle Airport.
-
D.
RER line E
RER line E is a Paris regional express railway line connecting central Paris with eastern suburbs such as Gagny.
-
E.
RER line D
RER line D is one of the main lines of the Paris RER suburban rail network, running north–south through central Paris and serving numerous suburbs across the Île-de-France region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0083815208190a9b299b8e0640218 |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c068e89c2c81909eeedc234e8ccde2 |
completed | March 22, 2026, 10:10 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c640ce3f9481908fa96fb5b2bc8db9 |
completed | March 27, 2026, 8:33 a.m. |
Created at: March 22, 2026, 4:42 p.m.