Triple

T6411093
Position Surface form Disambiguated ID Type / Status
Subject Amfleet I coaches E127705 entity
Predicate usedWithLocomotiveType P5426 FINISHED
Object electric locomotives LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: electric locomotives | Statement: [Amfleet I coaches, usedWithLocomotiveType, electric locomotives]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usedWithLocomotiveType
Context triple: [Amfleet I coaches, usedWithLocomotiveType, electric locomotives]
  • A. hasLocomotive
    Indicates that one entity possesses or is equipped with a locomotive as part of its composition or operation.
  • B. associatedWithLocomotive
    Indicates a relationship where something is connected or related to a locomotive, such as by use, function, origin, or context.
  • C. usesRollingStockCompatibleWith
    Indicates that one entity operates using rolling stock that is technically and operationally compatible with the rolling stock standards or systems associated with another entity.
  • D. usesRollingStock chosen
    Indicates that one entity employs or operates specific rolling stock (such as rail vehicles) in its activities or services.
  • E. locomotiveWorks
    Indicates a relationship where an entity is a facility or company that builds, repairs, or maintains locomotives.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0083723d88190b1e37b19df162c08 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c068d0f2b88190af06c208d8c01d07 completed March 22, 2026, 10:10 p.m.
PD Predicate disambiguation batch_69c060f40ecc8190b1df17b96767675c completed March 22, 2026, 9:36 p.m.
Created at: March 22, 2026, 4:41 p.m.