Triple

T6407829
Position Surface form Disambiguated ID Type / Status
Subject Marquam Bridge E127630 entity
Predicate carries P1393 FINISHED
Object I-5 E18390 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-5 | Statement: [Marquam Bridge, carries, I-5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-5
Context triple: [Marquam Bridge, carries, I-5]
  • A. Interstate 5 chosen
    Interstate 5 is a major north–south U.S. highway running along the West Coast from the Mexican border in California through Oregon and Washington to the Canadian border.
  • B. Highway 99
    Highway 99 is a major scenic highway in British Columbia, Canada, that connects Vancouver to the resort town of Whistler and continues north through the Coast Mountains.
  • C. Interstate 526
    Interstate 526 is a partial beltway and auxiliary Interstate Highway serving the Charleston metropolitan area in South Carolina, connecting key suburbs, industrial zones, and major routes.
  • D. Highway 5
    Highway 5 is a major Finnish roadway that runs through eastern Finland, connecting several towns and regions including the municipality of Suomussalmi.
  • E. Interstate 530
    Interstate 530 is a spur highway in Arkansas that connects Pine Bluff to Little Rock, linking with Interstate 30 near the state capital.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0083723d88190b1e37b19df162c08 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c068ccd804819097b106604372c14a completed March 22, 2026, 10:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69c638b38c888190aa2433173db64c90 completed March 27, 2026, 7:58 a.m.
Created at: March 22, 2026, 4:41 p.m.