Triple

T6395665
Position Surface form Disambiguated ID Type / Status
Subject C-10 E143933 entity
Predicate runBy P7944 FINISHED
Object Renfe Operadora E142030 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Renfe Operadora | Statement: [C-10, runBy, Renfe Operadora]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Renfe Operadora
Context triple: [C-10, runBy, Renfe Operadora]
  • A. Renfe Operadora chosen
    Renfe Operadora is Spain’s national state-owned railway company, responsible for operating most passenger and freight rail services across the country.
  • B. Renfe Cercanías
    Renfe Cercanías is Spain’s suburban and commuter rail service network, operating frequent regional trains that connect major cities with their surrounding metropolitan areas.
  • C. Renfe Alvia
    Renfe Alvia is a Spanish long-distance high-speed train service operated by Renfe that combines standard and variable-gauge rolling stock to connect major cities across both high-speed and conventional rail lines.
  • D. Rodalies de Catalunya
    Rodalies de Catalunya is the commuter rail network serving Catalonia, centered on Barcelona and operated under the Renfe system.
  • E. Adif
    Adif is Spain’s state-owned railway infrastructure manager responsible for the construction, maintenance, and operation of most of the country’s rail network and stations.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008db906c819096f3597d55d95432 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0688275d0819086b58123c743a6db completed March 22, 2026, 10:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6d50423808190817cad8601490a77 completed March 27, 2026, 7:05 p.m.
Created at: March 22, 2026, 4:35 p.m.