Triple

T63590
Position Surface form Disambiguated ID Type / Status
Subject United States Atomic Energy Commission E1263 entity
Predicate oversawProject P1766 FINISHED
Object United States nuclear weapons testing program LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: United States nuclear weapons testing program | Statement: [United States Atomic Energy Commission, oversawProject, United States nuclear weapons testing program]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: oversawProject
Context triple: [United States Atomic Energy Commission, oversawProject, United States nuclear weapons testing program]
  • A. oversawEvent chosen
    Indicates that an entity had supervisory or managerial responsibility for the planning, execution, or overall conduct of an event.
  • B. workedUnder
    Indicates that one entity was hierarchically subordinate to and performed work under the supervision or authority of another entity.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. hasNotableProject
    Indicates that an entity is associated with a project that is distinguished or recognized as significant in some way.
  • E. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24ba4f760819081f6638a3c70538a completed Feb. 28, 2026, 1:57 a.m.
NER Named-entity recognition batch_69a24fd16c248190a6ee4cd96c388772 completed Feb. 28, 2026, 2:15 a.m.
PD Predicate disambiguation batch_69a24ea3c44081908fa3856969881d1f completed Feb. 28, 2026, 2:10 a.m.
Created at: Feb. 28, 2026, 2:02 a.m.