Triple
T6343556
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Church Avenue (IRT Nostrand Avenue Line) |
E142689
|
entity |
| Predicate | openedAsPartOf |
P9951
|
FINISHED |
| Object |
IRT Nostrand Avenue Line extension
The IRT Nostrand Avenue Line extension was a New York City Subway expansion project that extended service deeper into Brooklyn along Nostrand Avenue beyond its original terminus.
|
E594264
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IRT Nostrand Avenue Line extension | Statement: [Church Avenue (IRT Nostrand Avenue Line), openedAsPartOf, IRT Nostrand Avenue Line extension]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: IRT Nostrand Avenue Line extension Context triple: [Church Avenue (IRT Nostrand Avenue Line), openedAsPartOf, IRT Nostrand Avenue Line extension]
-
A.
Eastern Parkway Line
The Eastern Parkway Line is a major New York City Subway route in Brooklyn that carries 2, 3, 4, and 5 trains along Eastern Parkway as part of the IRT system.
-
B.
New Lots Line
The New Lots Line is a New York City Subway line in Brooklyn that serves the easternmost portion of the IRT system, terminating at New Lots Avenue.
-
C.
Jerome Avenue Line
The Jerome Avenue Line is a New York City Subway route in the Bronx, primarily served by the 4 train and running along Jerome Avenue from the Yankee Stadium area toward the northern end of the borough.
-
D.
Second Avenue Subway
The Second Avenue Subway is a New York City Subway line on Manhattan’s East Side, built to relieve congestion on the Lexington Avenue Line and long envisioned as a major north–south transit corridor.
-
E.
Newark City Subway line
The Newark City Subway line is a light rail service in Newark, New Jersey, operating largely in former subway and streetcar tunnels to connect downtown Newark with surrounding neighborhoods and transit hubs.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: IRT Nostrand Avenue Line extension Triple: [Church Avenue (IRT Nostrand Avenue Line), openedAsPartOf, IRT Nostrand Avenue Line extension]
Generated description
The IRT Nostrand Avenue Line extension was a New York City Subway expansion project that extended service deeper into Brooklyn along Nostrand Avenue beyond its original terminus.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: IRT Nostrand Avenue Line extension Target entity description: The IRT Nostrand Avenue Line extension was a New York City Subway expansion project that extended service deeper into Brooklyn along Nostrand Avenue beyond its original terminus.
-
A.
Eastern Parkway Line
The Eastern Parkway Line is a major New York City Subway route in Brooklyn that carries 2, 3, 4, and 5 trains along Eastern Parkway as part of the IRT system.
-
B.
New Lots Line
The New Lots Line is a New York City Subway line in Brooklyn that serves the easternmost portion of the IRT system, terminating at New Lots Avenue.
-
C.
Jerome Avenue Line
The Jerome Avenue Line is a New York City Subway route in the Bronx, primarily served by the 4 train and running along Jerome Avenue from the Yankee Stadium area toward the northern end of the borough.
-
D.
Second Avenue Subway
The Second Avenue Subway is a New York City Subway line on Manhattan’s East Side, built to relieve congestion on the Lexington Avenue Line and long envisioned as a major north–south transit corridor.
-
E.
Newark City Subway line
The Newark City Subway line is a light rail service in Newark, New Jersey, operating largely in former subway and streetcar tunnels to connect downtown Newark with surrounding neighborhoods and transit hubs.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008d5ab108190b346c465696824a9 |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c06745b3d88190bcabc2bf5d75555d |
completed | March 22, 2026, 10:03 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c64ba8838c8190873ebe0ae9c0237d |
completed | March 27, 2026, 9:19 a.m. |
| NEDg | Description generation | batch_69c64e4413f481908561a86bc9a9b0b2 |
completed | March 27, 2026, 9:30 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c64ec0d40881908fda2e994f0f6ed5 |
completed | March 27, 2026, 9:32 a.m. |
Created at: March 22, 2026, 4:31 p.m.