Triple

T6342201
Position Surface form Disambiguated ID Type / Status
Subject Belgian railway line 25 E142653 entity
Predicate operatedBy P86 FINISHED
Object NMBS/SNCB E78978 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NMBS/SNCB | Statement: [Belgian railway line 25, operatedBy, NMBS/SNCB]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NMBS/SNCB
Context triple: [Belgian railway line 25, operatedBy, NMBS/SNCB]
  • A. SNCB/NMBS chosen
    SNCB/NMBS is the Belgian national railway company responsible for operating most passenger train services and managing much of the rail infrastructure in Belgium.
  • B. Infrabel
    Infrabel is the Belgian railway infrastructure manager responsible for the construction, maintenance, and operation of the national rail network.
  • C. Intercity Brussels
    Intercity Brussels is an international high-speed train service connecting the Netherlands with Brussels in Belgium.
  • D. ProRail
    ProRail is the Dutch government-owned company responsible for managing and maintaining the national railway infrastructure in the Netherlands.
  • E. Belgian railway network
    The Belgian railway network is a dense, electrified rail system covering all regions of Belgium and connecting major cities domestically and internationally.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d5ab108190b346c465696824a9 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0674445748190bce2d638048be77c completed March 22, 2026, 10:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69c62d4656f48190a4725fdeb2dd255d completed March 27, 2026, 7:09 a.m.
Created at: March 22, 2026, 4:30 p.m.