Triple

T634047
Position Surface form Disambiguated ID Type / Status
Subject CCS (Combined Charging System) E15983 entity
Predicate fullName P16 FINISHED
Object Combined Charging System E15983 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Combined Charging System | Statement: [CCS (Combined Charging System), fullName, Combined Charging System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Combined Charging System
Context triple: [CCS (Combined Charging System), fullName, Combined Charging System]
  • A. CCS (Combined Charging System) chosen
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • B. NACS (North American Charging Standard, newer North American models)
    NACS (North American Charging Standard) is Tesla’s proprietary fast-charging connector design that has become a de facto standard for newer electric vehicles in North America.
  • C. Tesla Megacharger
    Tesla Megacharger is a high-power fast-charging system developed by Tesla to rapidly charge its electric Semi trucks for long-haul commercial use.
  • D. Tesla Supercharger network
    The Tesla Supercharger network is a global system of high-speed electric vehicle charging stations designed primarily for Tesla cars, enabling rapid long-distance travel.
  • E. Ventra
    Ventra is the contactless fare payment system used across Chicago’s public transit network, including buses and trains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935c131c8190a5378c6bf101e8cc completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a49ee4ee8481908ad45405e3f3835c completed March 1, 2026, 8:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69a56ef052308190bfaed448c3737ef6 completed March 2, 2026, 11:05 a.m.
Created at: March 1, 2026, 7:35 p.m.