Triple
T634046
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CCS (Combined Charging System) |
E15983
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fast charging standard |
C3599
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fast charging standard Context triple: [CCS (Combined Charging System), instanceOf, fast charging standard]
-
A.
fast day
A fast day is a designated period, often in religious or spiritual traditions, during which individuals abstain from some or all food and sometimes drink for purposes such as devotion, repentance, or reflection.
-
B.
power delivery specification
chosen
A power delivery specification defines the technical requirements, limits, and conditions under which electrical power must be supplied, distributed, and regulated within a system or between interconnected systems.
-
C.
automotive terminal
An automotive terminal is an electrical connector component used in vehicles to securely join wires to each other or to devices within the automotive electrical system.
-
D.
open standard
An open standard is a publicly available specification, developed and maintained through a transparent, collaborative process, that can be implemented and used by anyone without restrictive licensing.
-
E.
rapid transit line
A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4935c131c8190a5378c6bf101e8cc |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:35 p.m.