Triple

T6339232
Position Surface form Disambiguated ID Type / Status
Subject La Grande River E142579 entity
Predicate operatorOfHydroelectricComplex P52342 FINISHED
Object Hydro-Québec E176876 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hydro-Québec | Statement: [La Grande River, operatorOfHydroelectricComplex, Hydro-Québec]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hydro-Québec
Context triple: [La Grande River, operatorOfHydroelectricComplex, Hydro-Québec]
  • A. Hydro-Québec chosen
    Hydro-Québec is a Canadian public utility company owned by the government of Quebec that generates, transmits, and distributes electricity, primarily from hydroelectric power.
  • B. Manitoba Hydro
    Manitoba Hydro is a provincial Crown corporation in Manitoba, Canada, responsible for generating, transmitting, and distributing electricity—primarily from large hydroelectric facilities—as well as providing natural gas services.
  • C. Nalcor Energy
    Nalcor Energy is a former provincial Crown corporation in Newfoundland and Labrador that oversaw major energy projects, including hydroelectric developments and electricity generation assets.
  • D. Newfoundland and Labrador Hydro
    Newfoundland and Labrador Hydro is a provincial Crown-owned electric utility in Newfoundland and Labrador responsible for generating and transmitting electricity across the province.
  • E. Ontario Power Generation
    Ontario Power Generation is a large, government-owned electricity producer in Ontario, Canada, primarily known for operating nuclear, hydroelectric, and other power generating stations across the province.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorOfHydroelectricComplex
Context triple: [La Grande River, operatorOfHydroelectricComplex, Hydro-Québec]
  • A. hasHydroelectricProjectOperator chosen
    Indicates that a hydroelectric project is operated or managed by a specified operator entity.
  • B. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • C. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • D. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d5ab108190b346c465696824a9 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0654fb774819087bffb8b966a790a completed March 22, 2026, 9:55 p.m.
NED1 Entity disambiguation (via context triple) batch_69c62d4656f48190a4725fdeb2dd255d completed March 27, 2026, 7:09 a.m.
PD Predicate disambiguation batch_69c060ea1a988190889e47b7e0c819b8 completed March 22, 2026, 9:36 p.m.
Created at: March 22, 2026, 4:30 p.m.