Triple
T6321502
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harlem River crossings |
E141749
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | set of bridges and tunnels |
C12604
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: set of bridges and tunnels Context triple: [Harlem River crossings, instanceOf, set of bridges and tunnels]
-
A.
bridge–tunnel complex
A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
-
B.
combined road and rail bridge–tunnel
A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
-
C.
group of bridges
chosen
A group of bridges is a collection of bridge structures considered together, typically related by location, design, function, or management context.
-
D.
toll bridge
A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
-
E.
pair of bridges
A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008d13b8c8190be47d896eb735605 |
completed | March 22, 2026, 3:20 p.m. |
Created at: March 22, 2026, 4:29 p.m.