Triple

T6321502
Position Surface form Disambiguated ID Type / Status
Subject Harlem River crossings E141749 entity
Predicate instanceOf P0 FINISHED
Object set of bridges and tunnels C12604 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: set of bridges and tunnels
Context triple: [Harlem River crossings, instanceOf, set of bridges and tunnels]
  • A. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • B. combined road and rail bridge–tunnel
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • C. group of bridges chosen
    A group of bridges is a collection of bridge structures considered together, typically related by location, design, function, or management context.
  • D. toll bridge
    A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
  • E. pair of bridges
    A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d13b8c8190be47d896eb735605 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:29 p.m.