Triple
T629044
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Howland Hook Marine Terminal |
E15884
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | marine terminal |
C452
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: marine terminal Context triple: [Howland Hook Marine Terminal, instanceOf, marine terminal]
-
A.
seaport
chosen
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
B.
port authority
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
-
C.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
D.
maritime zone
A maritime zone is a legally defined area of the sea, measured from a coastal state's baseline, within which specific rights, jurisdiction, and responsibilities are allocated under international law.
-
E.
seaplane base
A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4935c131c8190a5378c6bf101e8cc |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:35 p.m.