Triple

T628654
Position Surface form Disambiguated ID Type / Status
Subject Operation Telic E15876 entity
Predicate instanceOf P0 FINISHED
Object British military operation C340 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British military operation
Context triple: [Operation Telic, instanceOf, British military operation]
  • A. military operation chosen
    A military operation is a coordinated and planned set of actions conducted by armed forces to achieve specific strategic, operational, or tactical objectives.
  • B. United Nations peacekeeping mission
    A United Nations peacekeeping mission is an international operation authorized by the UN to help maintain or restore peace and security in conflict-affected areas through the deployment of military, police, and civilian personnel under impartial mandates.
  • C. British Army organizational element
    A British Army organizational element is a defined structural unit—such as a section, platoon, company, battalion, brigade, or division—comprising personnel, equipment, and command relationships arranged to perform specific military roles within the Army’s hierarchy.
  • D. imperial war
    Imperial war is a large-scale, often expansionist conflict waged by an empire to acquire, control, or maintain dominance over territories, peoples, or resources beyond its original borders.
  • E. World War II military formation
    A World War II military formation is an organized grouping of military units—such as divisions, corps, or armies—structured and deployed by a nation’s armed forces during the Second World War to conduct coordinated combat and support operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935c131c8190a5378c6bf101e8cc completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:35 p.m.