Triple

T6281569
Position Surface form Disambiguated ID Type / Status
Subject Madrid city buses E140793 entity
Predicate instanceOf P0 FINISHED
Object bus transport in Spain C2489 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus transport in Spain
Context triple: [Madrid city buses, instanceOf, bus transport in Spain]
  • A. Madrid Metro station
    A Madrid Metro station is a designated underground or surface facility where passengers access, board, and transfer between trains on the Madrid Metro network.
  • B. public agency of Spain
    A public agency of Spain is an autonomous administrative body created by law to perform specific public functions or services under the supervision of a governmental ministry or authority.
  • C. public transportation infrastructure chosen
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • D. auto ferry train
    An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008cd17c8819082b82d3fbeb68047 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:26 p.m.