Triple

T6204741
Position Surface form Disambiguated ID Type / Status
Subject Madrid Deep Space Communications Complex E138719 entity
Predicate instanceOf P0 FINISHED
Object deep space communications complex C14251 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: deep space communications complex
Context triple: [Madrid Deep Space Communications Complex, instanceOf, deep space communications complex]
  • A. space communication network
    A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
  • B. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • C. ESA facility chosen
    An ESA facility is a specialized location, infrastructure, or installation operated or supported by the European Space Agency to conduct space-related research, development, testing, mission operations, or support services.
  • D. space communication project
    A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
  • E. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008acbea48190991c6b834bb45d65 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:20 p.m.