Triple

T6200714
Position Surface form Disambiguated ID Type / Status
Subject Grossaktion Warsaw E138621 entity
Predicate instanceOf P0 FINISHED
Object Nazi German operation C2184 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi German operation
Context triple: [Grossaktion Warsaw, instanceOf, Nazi German operation]
  • A. Kriegsmarine operation
    A Kriegsmarine operation is a coordinated naval action planned and executed by Nazi Germany’s navy during World War II to achieve specific military, strategic, or logistical objectives at sea.
  • B. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • C. World War II resistance operation
    A World War II resistance operation is a covert, organized action conducted by underground groups in occupied territories to sabotage enemy forces, gather intelligence, and support Allied war efforts.
  • D. Nazi Germany expansion
    Nazi Germany expansion refers to the aggressive territorial and political enlargement of Germany under Adolf Hitler from 1938 to 1941 through annexations, invasions, and occupations that precipitated and escalated World War II in Europe.
  • E. event in Nazi Germany chosen
    An event in Nazi Germany is a historically situated occurrence—political, social, military, cultural, or economic—that took place under the National Socialist regime between 1933 and 1945 and contributed to its policies, ideology, or consequences.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008acbea48190991c6b834bb45d65 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:20 p.m.