Triple

T6196337
Position Surface form Disambiguated ID Type / Status
Subject Scania E138516 entity
Predicate connectedBy P37 FINISHED
Object Öresund Bridge E222207 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Öresund Bridge | Statement: [Scania, connectedBy, Öresund Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Öresund Bridge
Context triple: [Scania, connectedBy, Öresund Bridge]
  • A. Øresund Bridge chosen
    The Øresund Bridge is a combined road and rail bridge–tunnel linking Denmark and Sweden across the Øresund strait, serving as a major transport corridor between Copenhagen and Malmö.
  • B. Öland Bridge
    Öland Bridge is a long road bridge in Sweden that spans the Kalmar Strait, linking the island of Öland with the mainland near the city of Kalmar.
  • C. Great Belt Bridge
    The Great Belt Bridge is a major Danish suspension bridge that forms part of the Great Belt Fixed Link, connecting the islands of Funen and Zealand across the Great Belt strait.
  • D. Rügen Bridge
    The Rügen Bridge is a modern cable-stayed road bridge in Germany that connects the mainland city of Stralsund with the Baltic Sea island of Rügen, serving as a major transport link in the region.
  • E. Älvsborg Bridge
    Älvsborg Bridge is a large suspension bridge in Gothenburg, Sweden, known for connecting the city across the Göta älv and serving as a key part of its road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008ab9b3081908a11b2c744838435 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0624571508190bd273b4a051fbe41 completed March 22, 2026, 9:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69c16f234ffc8190a6e8166e2ac554a8 completed March 23, 2026, 4:49 p.m.
Created at: March 22, 2026, 4:20 p.m.