Triple

T619129
Position Surface form Disambiguated ID Type / Status
Subject Oesterdam E14471 entity
Predicate instanceOf P0 FINISHED
Object storm surge barrier C3669 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: storm surge barrier
Context triple: [Oesterdam, instanceOf, storm surge barrier]
  • A. seawall chosen
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • B. blockade
    A blockade is a deliberate obstruction or sealing off of a place, route, or resource to prevent goods, people, or information from passing through.
  • C. sea fort
    A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
  • D. estuary
    An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
  • E. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934b17c881909ace8270e8ddd202 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:35 p.m.