Triple

T6179817
Position Surface form Disambiguated ID Type / Status
Subject K2 beam line E137912 entity
Predicate sourceAccelerator P24991 FINISHED
Object Super Proton Synchrotron primary beam LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Super Proton Synchrotron primary beam | Statement: [K2 beam line, sourceAccelerator, Super Proton Synchrotron primary beam]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: sourceAccelerator
Context triple: [K2 beam line, sourceAccelerator, Super Proton Synchrotron primary beam]
  • A. usedAccelerator
    Indicates that an entity has applied or made use of an accelerator (such as a device, mechanism, or process) to increase speed, performance, or progress in relation to another entity or activity.
  • B. accelerates
    Indicates that one entity causes an increase in the speed or rate of change of another entity or process.
  • C. parentAccelerator chosen
    Indicates that one accelerator entity functions as the parent or higher-level accelerator in relation to another accelerator entity.
  • D. acceleratedAfter
    Indicates that one entity increases its speed or rate of change following, and as a consequence of, another specified event or condition.
  • E. acceleratingGradient
    Indicates that a process, change, or effect is increasing in rate over time, becoming progressively faster or more intense.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a80f748190ba3d07ffc81acb29 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05dcb77948190b5385438f81bf0a8 completed March 22, 2026, 9:23 p.m.
PD Predicate disambiguation batch_69c055fa0a808190bda37832e3ac150c completed March 22, 2026, 8:50 p.m.
Created at: March 22, 2026, 4:18 p.m.