Triple

T6160069
Position Surface form Disambiguated ID Type / Status
Subject Air Force Two E137416 entity
Predicate relatedCallSign P7987 FINISHED
Object Army Two E173577 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Army Two | Statement: [Air Force Two, relatedCallSign, Army Two]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Army Two
Context triple: [Air Force Two, relatedCallSign, Army Two]
  • A. Army Two chosen
    Army Two is a military call sign designation, likely used to identify a specific unit, role, or individual within an armed forces communication network.
  • B. Army Day
    Army Day is a Chinese national holiday observed on August 1st to commemorate the founding of the People's Liberation Army in 1927.
  • C. Two Soldiers
    "Two Soldiers" is a traditional American folk ballad about brothers going off to war, notably popularized by Bob Dylan’s recording on his 1993 album *World Gone Wrong*.
  • D. Army Strong
    Army Strong is a former U.S. Army recruiting slogan emphasizing the physical, mental, and emotional strength of soldiers.
  • E. Home Front Command
    Home Front Command is the Israel Defense Forces branch responsible for civil defense, emergency preparedness, and protecting the civilian population during conflicts and disasters.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a54fc88190b6ce4416490ca79d completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05d3445dc8190822954cee90f0dd7 completed March 22, 2026, 9:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69c14194d31081908e61a867f11117b4 completed March 23, 2026, 1:35 p.m.
Created at: March 22, 2026, 4:17 p.m.