Triple

T6153914
Position Surface form Disambiguated ID Type / Status
Subject Houtribdijk E137271 entity
Predicate statusOfMarkerwaardProject P39444 FINISHED
Object cancelled LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cancelled | Statement: [Houtribdijk, statusOfMarkerwaardProject, cancelled]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusOfMarkerwaardProject
Context triple: [Houtribdijk, statusOfMarkerwaardProject, cancelled]
  • A. benchmarkStatus
    Indicates the current evaluation state or outcome of a benchmark process applied to an entity or system.
  • B. statusIndicates
    Indicates that a particular status value conveys or reflects the current condition, state, or situation of an entity or process.
  • C. valuationStatus
    Indicates the current state or condition of an entity’s assessed value within a valuation process (e.g., pending, active, finalized, or invalid).
  • D. deFactoStatus
    Indicates that one entity holds a role, position, or status in practice or by custom, even if it is not formally or legally recognized.
  • E. worksStatus chosen
    Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a45d008190832a9e19f5d63406 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05cffc7bc819092633a9e5f1abe2f completed March 22, 2026, 9:20 p.m.
PD Predicate disambiguation batch_69c055f39e0881909ae56444b1b48929 completed March 22, 2026, 8:49 p.m.
Created at: March 22, 2026, 4:17 p.m.